Date: 02/27/2005 Views: 5159
Date: 05/19/2008 Views: 5878
Date: 07/20/2004 Views: 3620
Date: 08/23/2023 Views: 841392
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.