Date: 06/13/2007 Views: 5150
Date: 10/11/2009 Views: 6698
Date: 09/28/2007 Views: 7901
Date: 08/23/2023 Views: 820619
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09