Date: 11/18/2007 Views: 6575
Date: 07/25/2009 Views: 5584
Date: 10/29/2007 Views: 7648
Date: 08/23/2023 Views: 813650
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09