Date: 12/31/1969 Views: 3915
Date: 06/19/2009 Views: 4794
Date: 04/02/2009 Views: 5887
Date: 08/23/2023 Views: 820631
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09