Date: 01/18/2008 Views: 4610
Date: 05/19/2008 Views: 6658
Date: 10/05/2003 Views: 6525
Date: 08/23/2023 Views: 818132
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09