Door sill conduit run 10.
Art prepared 5 clamps that will hold our conduit's in place.
What an engineering project, can't clamp too tight, or too loose, clamp can't be too heavy and it needs to clamp at the proper angle.
Next session will give them a try when we bond our conduits in place.
Plan:
**Have Balsa with 1 BID on inside
**Going to hinge conduit in place at bottom with tape
**Going to swing opened conduit and 3 thin model aeroplane glass bottom corner after floxxing
**Going to JB KWIK in place on top and swing closed conduit and use Arts 5 clamps to hold closed until cure
**Last step is to Flox and 2 BID outside of conduit.
We will have to do one side at a time because we only have 5 clamps.