Pilot / Co-Pilot stick grip and selector switch 1 of 2.
Date: 01/21/2003
Views: 9698
Old version 2 Main Schematic Y9-03-06.
Date: 03/03/2009
Views: 12435
Front HardPoint 1
Date: 12/27/2013
Views: 10268
Newest Image
EAA SITE
Date: 08/23/2023
Views: 841392
Generator harness install 1 of 2.
1) First order of business is to scratch off the black paint from both sides of the flange where the ground connector will be attached. Once the flange is nice and clean from the black paint, install the ground connector with hardware being only finger tight.
2)Next using pliers, gently crush both sides of the Faston connector to insure there is ample spring tension to make a good electrical connection, then push the Faston onto the 1/4" tab. This is the positive connection to the generator.
3) As per picture 2 of 2 cut a 5' long piece of 1 x 2.
4) Determine the exact location you want to install the Adel clamp and wrap that location with Friction Tape until it is built up in diameter where the clamp will hold the wire. Then using a 1" Sheetrock screw with a washer under the head, screw the clamp to the 1 x 2.