|
|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 7763
|
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 7854
|
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 6714
|
|
|
Rib to tie together.
Date: 01/20/2010
Views: 6215
|
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 5983
|
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 7223
|
|
|
2 BID back.
Date: 01/21/2010
Views: 6631
|
|
|
1 BID front.
Date: 01/21/2010
Views: 6934
|
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 7794
|
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 6700
|