|
|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 7693
|
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 7765
|
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 6633
|
|
|
Rib to tie together.
Date: 01/20/2010
Views: 6123
|
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 5910
|
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 7167
|
|
|
2 BID back.
Date: 01/21/2010
Views: 6560
|
|
|
1 BID front.
Date: 01/21/2010
Views: 6842
|
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 7713
|
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 6618
|