|
Needed to work with a mirror for joint layups.
Date: 01/20/2010
Views: 6151
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 6003
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 5409
|
|
Rib to tie together.
Date: 01/20/2010
Views: 4896
|
|
Ready for 2 BID back, 1 BID front.
Date: 01/20/2010
Views: 4749
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 5887
|
|
2 BID back.
Date: 01/21/2010
Views: 5272
|
|
1 BID front.
Date: 01/21/2010
Views: 5264
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 5974
|
|
BID in place and plenty stiff.
Date: 01/21/2010
Views: 5263
|