Trimmed tang overhang inboard of the inboard edge of hinge leaving thickness of tang plus 10%.
Date: 10/12/2009
Views: 5701
Newest Image
EAA SITE
Date: 08/23/2023
Views: 815406
Port bottom strengthening.
Flange was removed to allow module to fit on top of tunnel, and we also removed a portion of tunnel in module that was meant for sight gauge because we needed clearance for our pilot/co-pilot switch connections. Anyway this is where we want to mount port lower bracket that ties to firewall and it is just not strong enough. Resolution is a carbon fiber rod and a piece of 1/8plywood.
CF here floxed in place. Tip without wood will be 2 BID and the end with wood will also be 2 BID.
Y10-01-24