Login
EuropaOwners Brian Skelly. Building Kit A276 N220BT. N Texas USA Chapter Eight Port Wing CH8P_28
Advanced Search
View Slideshow (Fullscreen)

Chapter Eight Port Wing

1. CH8P_1 ... 26. CH8Pmod_2 27. CH8Pmod_4 28. CH8Pmod_3 29. CH8Pmod_5 30. CH8Pmod_6 31. CH8P_28 32. CH8P_29

Random Images

FuelSightGage06Ann

FuelSightGage06Ann

Date: 06/05/2004 Views: 3155

DSC00210

DSC00210

Date: 04/10/2009 Views: 5141

Tie-bar 39.

Tie-bar 39.

Date: 11/16/2010 Views: 7963

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 718873

CH8P_28

Chapter Eight Port Wing Aileron Close outs. Spread the aileron opening area using a 2 ½ inch wide piece of wood wrapped in packing tape. This procedure has been added to the new manuals. It is necessary to spread the opening for full aileron movement. The reinforcement will cure and the close out will retain the proper gap.

Date: 04/29/2006
Size:
Full size: 800x600
nextlast
first previous
CH8P_28

Photo Properties

summary  details
Make SONY Model DSC-P52
Aperture Value f/3.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Compulsory Flash, Return light detected Focal Length 6.3 mm
ISO 160 Metering Mode Multi-Segment
Shutter Speed Value 1/40 sec Date/Time Sat 29 Apr 2006 09:47:04 AM UTC
nextlast
first previous
Powered by Gallery v2.3