Port layup looks OK, but the fit is awful as well.
Date: 10/11/2010
Views: 7853
Newest Image
EAA SITE
Date: 08/23/2023
Views: 809316
IMG_0129post
When the Bondo has cured the LG legs are greased over the area where they are within the socket and they are inserted into the sockets. Then the Araldite/FLOX is applied to the flanges of the sockets and the LG legs/sockets are reinserted. All is clamped tightly.