Second and final pass of Port top wingskin bond on 1.
Date: 09/13/2010
Views: 6369
Scandinavia_667
Date: 06/13/2004
Views: 5713
Newest Image
EAA SITE
Date: 08/23/2023
Views: 818786
InstrumentPanel112Ann
After the layups cured, holes were drilled and the shock mounts were installed. There will probalby be another on the top right, but I need to put the panel in place to ensure it doesn't interfere with firewall wiring. Maybe next weekend...