Date: 10/26/2009 Views: 5769
Date: 07/19/2007 Views: 5148
Date: 09/19/2008 Views: 6084
Date: 08/23/2023 Views: 859280
The now lengthened lines have been routed around the problem area and come in from the aft. The extensions have been connected to the fuel pump plumbing. This completes the fuel system aft of the firewall.