Date: 10/29/2006 Views: 5457
Date: 07/01/2005 Views: 10054
Date: 12/31/1969 Views: 5143
Date: 08/23/2023 Views: 804381
The now lengthened lines have been routed around the problem area and come in from the aft. The extensions have been connected to the fuel pump plumbing. This completes the fuel system aft of the firewall.