Fit baggage bay bulkhead - floor before fitting fairings Frans
Date: 12/08/2010
Views: 6521
Klaus-Building-His-Plane
Date: 10/20/2009
Views: 28029
imm030_31A
Date: 09/03/2009
Views: 10042
Newest Image
EAA SITE
Date: 08/23/2023
Views: 702765
SingletonFirewall18Ann
Holes were cut into the firewall for the Al "eyeball" firewall penetrations for the throttle and "choke" cables. This pic gives an idea what the final installation will look like. Next job is to drill the 9/16" holes for the fuel line firewall penetrations and complete the fuel line installation. A suitable 9/16" drill bit is on order from Good Ol' McMaster-Carr.