Second and final pass of Port top wingskin bond on 7.
Date: 09/13/2010
Views: 6927
Cooling and Garmin 296 GPS antenna placement.
Date: 02/07/2010
Views: 7748
Newest Image
EAA SITE
Date: 08/23/2023
Views: 784611
DSCN5759Ann
The bonding area of both the cowl and scoop was scuff sanded with coarse sandpaper. A small quantity of Araldite was mixed and applied to the bond area of the scoop. The scoop was positioned in the lined location.