Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 9471
Control_Systems_54
Date: 01/23/2006
Views: 4937
Newest Image
EAA SITE
Date: 08/23/2023
Views: 820632
DSCN6071Ann
The relay has been temporarily bolted down. I have plans to go from the single buss (as provided by the folks who originally did my instrument panel) to a a dual buss (essential and main) setup while the aircraft is down for the winter. The essential will be powered by the Rotax alternator and (hopefully) a Schicke GR6 Regulator. The main buss will be powered by the Denso alternator. This relay will then be used as a crossover in case the Rotax alternator goes down.