Tank cleaning, through vent and sender with borescope.
Date: 06/28/2010
Views: 9250
Tallin EETN Estonia
Date: 06/07/2005
Views: 7799
Mod_70_04
Date: 04/15/2006
Views: 9257
Newest Image
EAA SITE
Date: 08/23/2023
Views: 812887
DoorSupportMod06
Completed the shaping of the lower door struts. Measured and marked the locations for the bushings on all of the struts. Oriented the bushings so that there was 7.5mm from the bottom of the strut to the center of the bushing. Mixed a small batch of Araldite 420 A/B and added milled fiber for strength and body. Bonded the bushing in place and applied a G-clamp to hold them. Used the remaining Araldite mix to make fillet around the bushing