Date: 05/04/2007 Views: 6328
Date: 09/01/2007 Views: 7554
Date: 10/26/2008 Views: 7865
Date: 08/23/2023 Views: 820589
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.