Date: 07/09/2003 Views: 4306
Date: 10/19/2008 Views: 2701
Date: 09/21/2007 Views: 3054
Date: 08/23/2023 Views: 84122
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.