Date: 05/03/2009 Views: 7334
Date: 12/31/1969 Views: 4806
Date: 02/14/2009 Views: 6415
Date: 08/23/2023 Views: 808286
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.