Date: 04/15/2006 Views: 8642
Date: 09/17/2009 Views: 6991
Date: 08/19/2010 Views: 4794
Date: 08/23/2023 Views: 831868
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.