Date: 04/27/2005 Views: 7029
Date: 11/02/2009 Views: 5166
Date: 01/24/2013 Views: 18098
Date: 08/23/2023 Views: 820123
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.