Date: 03/21/2009 Views: 4867
Date: 02/21/2010 Views: 5384
Date: 12/31/1969 Views: 4470
Date: 08/23/2023 Views: 817116
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.