Date: 10/03/2003 Views: 8368
Date: 04/15/2004 Views: 8097
Date: 10/11/2009 Views: 5790
Date: 08/23/2023 Views: 807647
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.