Date: 08/09/2009 Views: 5901
Date: 09/04/2009 Views: 7208
Date: 10/11/2009 Views: 5634
Date: 08/23/2023 Views: 807572
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.