Date: 11/29/1999 Views: 6442
Date: 09/16/2006 Views: 4046
Date: 05/07/2009 Views: 6878
Date: 08/23/2023 Views: 815530
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.