Date: 04/07/2006 Views: 12573
Date: 06/23/2004 Views: 4826
Date: 04/05/2009 Views: 6455
Date: 08/23/2023 Views: 834717
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.