Date: 12/31/1969 Views: 4904
Date: 08/11/2004 Views: 4229
Date: 06/13/2004 Views: 6168
Date: 08/23/2023 Views: 784621
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.