Date: 12/31/1969 Views: 6753
Date: 08/18/2009 Views: 5034
Date: 10/12/2009 Views: 13168
Date: 08/23/2023 Views: 816487
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.