Date: 04/29/2008 Views: 4441
Date: 12/31/1969 Views: 4469
Date: 10/30/2007 Views: 6785
Date: 08/23/2023 Views: 811979
The hinge areas were scuff sanded in preparation for the layups. A small batch of expoxy was mixed with FLOX. This was applied to the area of the upper hinge where a flange area has been ground flat.