Date: 06/02/2009 Views: 5556
Date: 07/29/2007 Views: 3732
Date: 06/07/2009 Views: 6364
Date: 08/23/2023 Views: 811818
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.