Date: 02/05/2006 Views: 6496
Date: 12/31/1969 Views: 4460
Date: 06/18/2006 Views: 7976
Date: 08/23/2023 Views: 784571
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.