Date: 07/01/2005 Views: 3386
Date: 06/29/2009 Views: 2426
Date: 01/23/2006 Views: 2205
Date: 08/23/2023 Views: 84448
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.