Date: 02/09/2004 Views: 6641
Date: 06/30/2006 Views: 8676
Date: 12/31/1969 Views: 4588
Date: 08/23/2023 Views: 729391
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.