Date: 12/01/2004 Views: 8318
Date: 04/09/2016 Views: 14832
Date: 12/31/1999 Views: 7357
Date: 08/23/2023 Views: 862417
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.