Date: 12/31/1969 Views: 4148
Date: 11/07/2010 Views: 8976
Date: 04/08/2004 Views: 5080
Date: 08/23/2023 Views: 754810
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.