Date: 02/15/2008 Views: 6954
Date: 02/18/2011 Views: 4942
Date: 11/17/2005 Views: 6208
Date: 08/23/2023 Views: 808218
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.