Date: 12/31/1969 Views: 7479
Date: 12/28/2009 Views: 8433
Date: 12/11/2010 Views: 7554
Date: 08/23/2023 Views: 821274
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.