Date: 12/26/2005 Views: 5579
Date: 08/09/2009 Views: 6186
Date: 01/23/2009 Views: 6284
Date: 08/23/2023 Views: 820605
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.