Date: 04/14/2012 Views: 21319
Date: 04/02/2009 Views: 4690
Date: 12/31/1969 Views: 4509
Date: 08/23/2023 Views: 817377
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.