Date: 05/31/2009 Views: 7074
Date: 03/17/2008 Views: 6231
Date: 12/31/1969 Views: 4967
Date: 08/23/2023 Views: 857694
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.