Date: 04/23/2009 Views: 5506
Date: 10/17/2013 Views: 10675
Date: 04/26/2008 Views: 4024
Date: 08/23/2023 Views: 805829
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.