Date: 07/09/2004 Views: 4589
Date: 12/31/1969 Views: 4591
Date: 08/12/2003 Views: 10037
Date: 08/23/2023 Views: 820191
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.