Date: 09/15/2005 Views: 3261
Date: 09/21/2008 Views: 3252
Date: 09/15/2009 Views: 5696
Date: 08/23/2023 Views: 95636
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.