Date: 12/31/1969 Views: 4165
Date: 09/04/2009 Views: 7794
Date: 04/15/2006 Views: 11343
Date: 08/23/2023 Views: 806142
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.