Date: 12/19/2006 Views: 4396
Date: 11/18/2007 Views: 6732
Date: 01/23/2006 Views: 5873
Date: 08/23/2023 Views: 819099
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.