Date: 09/08/2009 Views: 4386
Date: 11/23/2009 Views: 5765
Date: 11/29/1999 Views: 6999
Date: 08/23/2023 Views: 807436
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.