Date: 02/03/2007 Views: 5467
Date: 10/25/2009 Views: 5534
Date: 03/26/2009 Views: 7091
Date: 08/23/2023 Views: 817756
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.