Date: 06/13/2010 Views: 5323
Date: 08/26/2010 Views: 4910
Date: 04/16/2006 Views: 6356
Date: 08/23/2023 Views: 836174
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.