|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 6336
|
|
nex_2013_08_24_02
nex_2013_08_24_02.jpg
Date: 08/25/2013
Views: 5884
|
|
nex_2013_08_24_03
nex_2013_08_24_03.jpg
Date: 08/25/2013
Views: 5811
|
|
nex_2013_08_24_04
As you see here the port side is done with rib 3 and 4. I didn't have photos of doing the layups.
Date: 08/25/2013
Views: 6099
|
|
nex_2013_08_24_06
Time for some clean up.
Date: 08/25/2013
Views: 6098
|
|
nex_2014_01_12_02
Rat's tail rasp works great here.
Date: 01/13/2014
Views: 5956
|
|
nex_2014_01_12_04
Port LG in place with bolt in.
Date: 01/13/2014
Views: 5939
|
|
nex_2014_01_12_05
Port side top.
Date: 01/13/2014
Views: 5999
|
|
nex_2014_01_12_06
She's got a leg!
Date: 01/13/2014
Views: 6092
|
|
nex_2014_01_12_07
Port side.
Date: 01/13/2014
Views: 6155
|