Login
EuropaOwners Recent Updates Port bottom strengthening.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Engine... ... 208. Larger... 209. Drilled... 210. Antenna... 211. Port bottom... 212. 1 BID front. 213. Most... 214. 2 BID back. ... 261. N4211W...

Random Images

IMG_0188post

IMG_0188post

Date: 09/08/2010 Views: 4507

Second and final pass of Port top wingskin bond on 3.

Second and final pass of Port top wingskin bond on 3.

Date: 09/13/2010 Views: 6380

Headrest_11

Headrest_11

Date: 03/01/2009 Views: 6267

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 698254

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 698254

Port bottom strengthening.

Flange was removed to allow module to fit on top of tunnel, and we also removed a portion of tunnel in module that was meant for sight gauge because we needed clearance for our pilot/co-pilot switch connections. Anyway this is where we want to mount port lower bracket that ties to firewall and it is just not strong enough. Resolution is a carbon fiber rod and a piece of 1/8plywood.
CF here floxed in place. Tip without wood will be 2 BID and the end with wood will also be 2 BID.
Y10-01-24

Date: 01/20/2010
Size:
Full size: 2592x1944
nextlast
first previous
Port bottom strengthening.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Thu 21 Jan 2010 01:17:13 AM UTC
nextlast
first previous
Powered by Gallery v2.3