|
|
DSCF0083
Date: 04/02/2009
Views: 5383
|
|
|
IMG_7532ann
A phone call to Dan at CorbiAir resolved the first two problems. The pump is designed to REPLACE an existing pump which would have a 950 226 or 950 227 spacer/gasket in place. This would hold the pump off that edge. And if there were a pump in place, t
Date: 04/18/2010
Views: 5730
|
|
|
|
16022003114323_G
Date: 12/31/1969
Views: 3786
|
|
|
IMG_7749Ann
Date: 06/07/2008
Views: 5415
|
|
|
|
IMG_1459p
Work continued on the priming/sanding of the repaired areas like the port wing outer flap bracket
Date: 06/05/2011
Views: 4025
|
|
|
DSCN6671
Date: 10/25/2009
Views: 4817
|
|
|
|
Tie-bar 76.
Date: 11/29/2010
Views: 9518
|
|
|
Floor relay 2.
Date: 06/16/2010
Views: 7365
|
|
|
|
05072003181924_G
Date: 12/31/1969
Views: 3556
|
|
|
Scandinavia_672
Date: 06/13/2004
Views: 5284
|
|
|
|
121502_fuseblock
Date: 12/31/1969
Views: 5360
|
|
|
cmb_ 30 _fuelsystem
Date: 11/18/2013
Views: 4802
|
|
|
|
CH17MOD_3
Date: 12/31/1969
Views: 5023
|
|
|
24_04_08_vliegfoto_s_004
Date: 04/26/2008
Views: 3737
|
|
|
|
IMG_1683
Date: 05/30/2010
Views: 13828
|
|
|
CH8P_15
Date: 12/31/1969
Views: 5894
|
|
|
|
Panel population 2.
Date: 03/01/2010
Views: 6353
|
|
|
Hudson_1
Date: 02/27/2009
Views: 4481
|
|
|
|
IM003607
Date: 11/24/2007
Views: 7695
|
|
|
CBM - 11 - PREPARE MOULDINGS
Date: 11/18/2013
Views: 4590
|
|